完工成本用英语怎么说,完工成本的英文翻译


词语导航

基本信息

词语:完工成本

繁体:完工成本

拼音:wán gōng chéng běn

英语翻译

【经】 complete cost; finished cost

分词翻译

完的英语翻译:

finish; thru; use up; whole

工的英语翻译:

labour; man-day; project; skill; work; worker

成本的英语翻译:

costing
【经】 cost; cost,insurance,freight by plane; degression

翻译例句

1. 完工成本也能用来预测工作进度。

The cost incurred to date can also be used to estimate the work progress.

2. 预计总成本完工成本、许诺成本跟附加成本累加得到。

Estimated total costs are the sum of cost to date, commitments and exposure.

3. 假如这种可比的成本超支持续累计下去,那么完工成本将变高。

If comparable cost overruns continue to accumulate, then the cost-to-complete will be even higher.

4. 通过能源恢复,实际上我们所有的办公场所和完工区域所需的热量全部是从数据中心获得的,因此,我们供暖可以说是0成本的。

With energy recovery, we actually get all the heat for the office space and finished areas from the datacenter, so we have zero heating costs.

5. 该预算成本也要定期更新,以反映完工前的预测成本,并确保项目完工前的现金投入。

The budgeted cost should also be updated periodically to reflect the estimated cost to completion as well as to insure adequate cash flows for the completion of the project.

6. 合同完工进度和为完成合同尚需发生的成本能够可靠地确定。

Both the schedule of the contracted project and the contract costs to complete the contract can be measured in a reliable way.

7. 而对有些历史数据完全的工作,即便数据之间成非线性关系,仍可预测其成本超支和完工百分比。

For activities with good historical records, it can be the case that a typically non-linear profile of cost expenditures and completion proportions can be estimated.

8. 人们已经发现如果低出价的投标额增加,完工项目的成本绝对会随之而增加,并且与原有的出价之间存在相应的百分比关系。

It was found that as the magnitude of the low bid increased, the resulting completed project cost tended to increase absolutely and as a percentage of the original bid.

9. 房地产项目只有实施了有效的风险管理,才能真正实现项目质量优良、成本合理和按时完工

After all, only those Real estate projects who implies the effective risk management could accomplish the project with high quality, reasonable cost and sufficient time.

10. 现代项目管理要求成本更低、周期更短、准时完工率更高。

Modern project management requires lower cost and shorter time and a higher completion rate.

11. 按项目完工百分比法计提收入,结转销售成本科目审核生产发货记录,生成应收账款,核对销售收入。

Check the delivery, create AR entries, and Accrue the revenue by percentage of completion method monthly.

12. 这三个油井一完工,完井总成本就能迅速确定。

The completion costs will be provided once all three Wells have been completed.

13. 一个车间在期初和期末通常都有在产品,所以本车间发生的成本并非已完工成品的成本

A department often begins and ends a cost period with partially processed units of product, so the completed units in the department are not an accurate measure of the department"s total production.

14. 例如,图5.1中的a点表现在对应的完工百分比上其成本却有所超支,即在该点劳动量完成了40%,但成本支出却占到了预算成本的60%。

For example, point a in Figure 5.1 suggests a higher expenditure than is normal for the completion proportion. This point represents 40% of work completed with an expenditure of 60% of the budget.

15. 有时也称已作的实际成本

Also referred to as the actual cost of work performed.www.weNtiyI.COM

16. 在作业成本法中,以下哪一个是把材料处理成本分配到已完工产品中的合理基础?

Which of the following would be a reasonable basis for allocating the material handling costs to the units produced in an activity-based costing system?

17. 利用已程、在建工程的材料、人工、机械、其他直接费、现场经费等成本数据、生产要素市场价格信息、宏观经济信息等历史和当前数据建立工程成本数据库。

The author refers in the article that we could set up an engineering cost database based on cost data like Labor, material. other direct expense, and so on…

18. 利用已程、在建工程的材料、人工、机械、其他直接费、现场经费等成本数据、生产要素市场价格信息、宏观经济信息等历史和当前数据建立工程成本数据库。

The author refers in the article that we could set up an engineering cost database based on cost data like Labor, material. other direct expense, and so on…

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!