
词语导航
基本信息
词语:项目排序
繁体:項目排序
拼音:xiàng mù pái xù
英语翻译
【电】 entry sorting
分词翻译
项目的英语翻译:
item
【化】 item; project
【经】 item
排序的英语翻译:
sort; taxis
【计】 sequencing; sort; sorting; sorting order
【化】 precedence ordering
翻译例句
1. 本文主要建立了具有不确定资源约束条件下的结构项目排序问题的一个数学模型。
The main problem discussed in this paper is the construction project scheduling mathematical model and a simple algorithm in the uncertain resource environments.
2. 先利用指派分配矩阵算法简化排序问题,再采用两种排序规则相结合的方法进行项目排序。
Responsibility Assignment Matrix is firstly used to simplify the scheduling problem, and then the combination of two sequence regulations is to solve the problem.wWW.WEnTIYi.coM
3. 并且还有强大个过滤功能,能指定目录展开的层数,依照任何项目排序,及计算目录大小等等功能。
And there are strong a filter function, can expand the number of layers specified directory, sorted in accordance with any project, and the calculated size of the directory and more.
4. To - do列表:浏览我当前的任务列表;去除那些不再重要的事情。重新给下一周要完成的工作项目排序。
To-do list: Read over my current task list; prune stuff that doesn"t matter any more; re-prioritize items to work on next week.
5. 在公路网规划中,常常涉及到对包含若干公路建设项目的方案进行比选、经济评价以及建设项目排序等问题。
In the regional highway network planning, comparison between planning schemes and economic appraisal is a very important part.
6. ListShuttle组件(参见图2)是从一个初始组中选择项目并对选定的项目排序的理想组件。
The List Shuttle component (see Figure 2) is ideal for selecting and ordering items from an initial group. Listing 9 demonstrates that it is also easier to use than you might initially think
7. 二是结合现有工程项目排序的经验方法,对不同的但是时间上有并行要求的项目,提出了适合目前阶段业务特点的项目排序的解决方法。
Secondly, regarding the different projects, but with parallel operation time, the solution of project scheduling is presented adapt to the business in current period.
8. swt树的一个较困难的方面是实现树项目的排序,对于这个主题,公共支持论坛中提供的信息难以满足广大用户的需求。
One difficult aspect of SWT trees is to implement sorting of the tree"s items, a topic on which information is much sought after in public support forums.
9. 最后,按照项目的创建时间对结果集进行排序,而且限制只返回十个结果。
Finally, the result set is sorted by the items" creation date, and limited to return only ten results.
10. 最后,在这三种解决方案针对您的特定项目时给它们排序只是整个比较过程的一部分。
Ultimately, ranking these three as they relate to your particular project is only part of the picture.
11. 这种测量不带数量信息,并且不表示对项目进行排序。
No quantitative information is conveyed and no ordering of the items is implied by the measurements.
12. 排序通过对树项目进行迭代(第37- 39行)来执行。
The sorting is performed by iterating through the tree"s items (lines 37 to 39).
13. 此项目是在1990年开始的,旨在对基因进行识别,为基因排序,因此可以为人类提供基因蓝图。
The project was started in 1990 to identify the genes and DNA sequences that provide a blueprint for human beings.
14. 需求排序列表是输入进项目定界过程中的关键因素。
A list of prioritized requirements is a key input into your project scoping efforts.
15. 你能够容易的操作和建立包括,编制项目列表,按列排序,添加表格,图片,评论,公式,更改字体等更多任务。
You can easily do all the basics, including making bulleted lists, sorting by columns, adding tables, images, comments, formulas, changing fonts and more.
16. 如果此示例中的团队使用了敏捷方法,如图2所示,则应该已经大致拟定了需求,但是允许项目所有者对需求进行优先排序。
If the team in the example had been using an agile approach, as shown in Figure 2, it would have roughly sketched out the requirements, but in a way that allowed the project owners to prioritize them.
17. 这时,请注意python使用了零排序,其中集合中的项目从零开始编号。
At this point, notice that Python USES zero ordering, where the items in a collection are numbered starting with zero.
18. 如果两个项目需要调换位置,一个布尔排序变量将设置为true(第46、49、86和89行)。
If two items need to switch places, a Boolean variable sort is set to true (lines 46, 49, 86, and 89).
19. Vuuch 4.5拥有一个按时间排序的列表,显示与当前用户有关的项目和对象的变更。
The Vuuch 4.5 activity stream is a time-ordered list of changes to the projects and deliverables the user is involved with.
20. 命名项目为order,并在向导的第二个页面上,对排序项目添加一个名为orderModel的空白包(见于图1)。
Name the project order and add a blank package called order Model to the order project on the second page of the wizard. (see Figure 1).
21. 该公司对当前各个项目进行优先等级排序的工作是由它的一个指导团队负责,在44个项目中,信息质量项目被排在第22位!
There was a steering team that prioritized the current projects.
22. 通过拖拉项目然后在优先级分组内为它们排序,来反映这种级别。
You reflect this ranking by dragging the items to order them within their priority grouping.
23. 这一步的目标是基于预定义的组合商业决策和优先级标准,选择和按优先级排序项目以获得最高的价值。
The objective of this step is to select and prioritize projects to deliver the highest value, based on the pre-established portfolio business decision and priority criteria.
24. 这需要定义组合策略和决策标准,它们允许管理人员选择和按优先级来排序项目。
This requires defining portfolio strategy and decision criteria that allow managers to select and prioritize projects.
25. 敏捷管理器是一种免费的敏捷项目管理工具,它的目的是要提供更好的计划、优先级排序和协作。
Agile Manager is a free agile project management tool meant to provide better planning, prioritization and collaboration.
26. 以上项目乘积作为总分,供排序用。排序周期一般为每季度一次或半年一次。
The above project product as total score, for sorting by. Ranking cycle is generally once a quarter or half a year.
27. 可以使用此工具包创建项目,创建和跟踪问题,指定问题所有者,使用布尔搜索对问题进行查询和排序。
You can use this kit to create projects, create and track issues, assign issue owners, and query and sort issues using a Boolean search.
28. 可以使用此工具包创建项目,创建和跟踪问题,指定问题所有者,使用布尔搜索对问题进行查询和排序。
You can use this kit to create projects, create and track issues, assign issue owners, and query and sort issues using a Boolean search.
版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!
