
词语导航
基本信息
词语:项目说明
繁体:項目說明
拼音:xiàng mù shuō míng
英语翻译
【计】 entry specification; ID
分词翻译
项目的英语翻译:
item
【化】 item; project
【经】 item
说明的英语翻译:
explain; narrate; account for; illustrate; make out; say; show; specify; state
directions; explanation
【计】 DCL; declaration; elucidata; explanatory notes
【化】 specification; specify
【经】 explanation; explanatory note; justification
翻译例句
1. 很短的应用,包括了一个句子项目说明,因此能够得到全面的信息简洁是关键。
The applications are short and include a one-sentence project description, so the ability to get across information succinctly is key.
2. 项目说明书中明确写道:“我们计划为有亲密关系的人比如情侣们研制一种新的远距离交流工具。”
"We propose a novel remote communication device for close relationships like lovers," the project description explains.
3. 接收和检查所有采购申请以确保它们的完整性,如涵括所有相关信息、项目说明、授权签字等。
Receives and checks all purchase requisitions to ensure they are complete and contain all relevant information such as item description, authorised signature , etc.
4. 这个重要项目说明了我们为各行业的客户提供了范围广泛的技术和解决方案,帮助他们具有竞争力和取得成功。
This important project illustrates the broad range of technologies and solutions we offer our customers in all industries to help them be competitive and successful.
5. 他提出理由说明他们需要更多的时间来完成该项目。
He argued that they needed more time to finish the project.
6. 我们老师进一步说明了这个项目。
Our teacher expanded on the details of the program.
7. 写一封电子邮件回答国际学生志愿者的询问,详细说明项目的细节。
Write an email to answer the inquiry from an international student volunteer, specifying the details of the project.
8. 如果经验证据能说明什么的话,那就是学校赞助的体育项目提供了与投入相称的资产回报。
If the empirical evidence points to anything, it points towards school-sponsored sports providing assets that are well worth the costs.
9. 此时,您将需要向为业务服务的所有项目团队说明soa的基本概念,并拟订与反馈和建议流程有关的策略计划。
At this point you"ll want to explain the basics of the SOA concept to all project teams serving the business and plan a strategy for a feedback and suggestion process.
10. 记住这篇文章不是我们以前工作的任何实际项目的说明,虽然它是基于我在实际项目中的经验的。wWw.WENtiyI.com
Remember that this article wasn"t an account of any actual previous project I worked on, although it was based on my experience on actual projects.
11. 适当的迭代项目管理说明从业者从事的工作应当是决定他们在给定量的时间里能完成多少。
Proper iterative program management dictates that the practitioners doing the work should be the ones deciding how much they can accomplish in a given amount of time.
12. 说明项目WAG使用方法的最佳途径是通过例子。
The best way to explain the use of the project WAG is through an example.
13. 定义服务意味着为它创建一个项目并创建说明详细信息(如名称空间和端口类型(接口)名)的WSDL文件。
Defining your service means creating a project for it and creating a WSDL file specifying details, such as the namespace and port type (interface) name.
14. 这是一个信号,说明项目代码中有些地方需要马上改正。
This is a signal that something in the project code needs to be fixed quickly.
15. 如果您需要更为详细地对列出的项目进行说明,请使用补充段落进行此工作。
If you need to explain a bullet in greater detail, do it in a supplementary paragraph.
16. 在每个产品页面,都有几个常见项目:标题、销售说明、缩略图图片、库存数量。
On each product page, there are the usual items: headlines, sales copy, thumbnail photos, the number of items in stock.
17. 有关更多信息,请参见项目下载说明。
See the project download instructions for more information.
18. SOA策略:说明项目将如何执行的概略计划。
SOA strategy: A high-level plan that explains how the project will be executed.
19. 这个消息说明项目4没有IRR.
This message indicates that project 4 has no IRR.
20. 净现值大于零说明项目对公司有正的净经济效益。
A net present value of greater than zero indicates that the project has positive net economic benefit to the company.
21. 净现值大于零说明项目对公司有正的净经济效益。
A net present value of greater than zero indicates that the project has positive net economic benefit to the company.
版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!
