总清单用英语怎么说,总清单的英文翻译


词语导航

基本信息

词语:总清单

繁体:總清單

拼音:zǒng qīng dān

英语翻译

【经】 general list

相关词条

1.masterlist  

分词翻译

总的英语翻译:

after all; always; chief; general; overall; put together; assemble
【医】 pan-; pant-; panto-

清单的英语翻译:

bill; detailed list; muster
【计】 listing
【经】 bill; statement

翻译例句

1. 联系领队,了解概况。除总清单所列事项外,讨论。

Contact the Team Leader and receive a general briefing. In addition to the general checklist, discuss.

2. 要确保总可以将文件放到需要的位置,您应该使用清单7中的命令从当前目录中添加文件。

To ensure you can always put the files where you want, you should add files from the current directory, using Listing 7.

3. 清单2显示的是第二个获取总记录数的请求。wWw.wENTiYi.Com

Listing 2 shows a second request to retrieve the total records.

4. 清单6将添加第一个基本的击键力度相关的检查子例程:密码输入总时间。

Listing 6 adds subroutines for the first basic keystroke dynamics-related check: total time of password entry.

5. 清单2.第二个请求:获取总记录数。

Listing 2. Second request: retrieve total records count.

6. 请参阅前面的清单6,总时间的90%以上都花在了or g . apache .axis . client . Call . invoke方法上。

Referring back to Listing 6, more than 90 percent of the total time was spent in the org.apache.axis.client.Call.invoke method.

7. 不要总幻想你只要做完清单的最后一件事情就可以休息,因为永远都有做不完的事情。

Don"t fall into the trap of thinking you"ll relax once you reach the bottom of the list - there will always be something more to do.

8. iSuppli更提供数据指出一部售价为600美元的iPhone,在进行总装前所花费的总材料清单仅为187.51美元。

The total bill of materials on a $600 iPhone — the supplies that go into final assembly — is $187.51, according to iSuppli.

9. 我们的清单上通常有这样一个事项,总是悬在头顶让我们揪心,但我们好像总不会去处理它。

We often have one item on the list that is hanging over our head and just doesn"t seem like it will get taken care of.

10. 根据总发运清单,编制非标包装的设计任务书并提交给包装设计工程师;

Prepare the Packing List for standard box according to Shipping List;

11. [摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

12. [摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!