缩短作业用英语怎么说,缩短作业的英文翻译


词语导航

基本信息

词语:缩短作业

繁体:縮短作業

拼音:suō duǎn zuò yè

英语翻译

【机】 reduction of operation

分词翻译

缩短的英语翻译:

cut; shorten; abbreviate; abridge; condense; curtail; short-circuit; telescope
【医】 decurtate; decurtation

作业的英语翻译:

exercise; operation; production; school assignment; task; work
【计】 job
【经】 operations; perform

翻译例句

1. 使用绞合海绵大大缩短作业。

By using pair sponge can significantly shorter operation.

2. 本实用新型具有缩短作业时间且保护电路板的功效。

The utility model has effects of reducing operation time and protecting the circuit board.

3. 该机器人能缩短作业周期,提高电站的经济效益,降低劳动强度,提高检测精度。

The robot can shorten the working period, raise the efficiency of the power plants, reduce working intensity and improve the measuring precision.WWw.weNTIYi.COm

4. 不动管柱简易酸化是一项较新的工艺,利用该技术可大大缩短作业周期、降低作业成本。

Original production string acidizing is a new technology, which can greatly shorten the recycle of acidizing treatment and economize operating cost.

5. 而图4 中显示的 T-ETL 作业的执行时间只有 127秒 ——总体执行时间缩短了 38% 之多。

The T-ETL job shown in Figure 4 executed in just 127 seconds -- an overall elapsed time improvement of 38 percent.

6. 处理时间缩短了,因为工作流为用户提供了他们执行作业所需的所有信息,缩短了任务的时间。

The processing time is smaller because the workflow presents the user with all of the information they need to perform their jobs, reducing the time for the task.

7. 原始stockcheckWebSphereDataStage作业执行时间为682秒,而t - ETL版本的作业的执行时间为124秒。消耗的时间大约缩短了82%。

The original StockCheck WebSphere DataStage job executed in 682 seconds, while the T-ETL version of the job executed in 124 seconds; an approximate elapsed time improvement of 82 percent.

8. 毫无疑问,缩短软件的开发周期将显著地加快作业系统的研制进程。

Undoubtedly, shortening the period of software development will noticeably promote the schedule of the operating system.

9. 充分利用空间和时间组织平行作业,缩短了主井装载系统建设工期2.5个月。

The main shaft to load the system construction work was shortened to expect 2. 5 months under well using of space and times organize homework.

10. 采用本文的方法,可使RTK平面和高程放样与水准测量工作同时进行,有利于提高作业效率,缩短工期。

By this method, leveling and GPS-RTK survey can be carried out at the same time, which can increase work efficiency and reduce job time.

11. 分析与测试表明,检查点与恢复执行功能正确,并能有效缩短大规模作业成功运行所需的时间。

Analysis and experiments show that the checkpoint and restart works correctly, and the time to complete large-scale jobs is reduced effect…

12. 系统在地图生产中的应用,减轻了作业员的劳动强度,缩短了地图的成图周期,提高了生产效率和地图质量。

It reduced the labor intensity and shortened the cycle of mapping, improved productivity and the quality of the production of the map.

13. 缩短射孔液对地层的浸泡时间,避免了起下作业过程中对油层的二次污染。

The utility model shortens the soak time of the perforating fluid to the stratum and avoids a secondary pollution to the oil layer during a pulling operation process.

14. 这种方法的最大优点就是在检修单独的车辆时不必进行解列作业,这样可以缩短列车的掉线时间。

The big advantage of this system is that you don"t have to break up the train into individual cars to do the work on one vehicle. The time saved reduces the period the train is out of service.

15. 提高货车的运用效率是煤矿运输工作的主要任务之一,因此研究分析货物作业停留时间,并采取措施缩短货物作业停留时间,是运输组织工作的一个重要方面。

One of the main task in coal railage is to improve van"s operating efficiency. So the important aspect of transportation organization work is to analysis cargo stay time and try to shorten it.

16. 本文从分析货物作业停留时间的影响因素入手,提出了缩短货物作业停留时间的有效措施主要是技术组织和技术管理。

In this paper, starting with analyzing factors which affect cargo stay time, are some measures to shorten cargo stay time.

17. 有效去除了物料表面水滴,大大缩短了贴标、装箱的准备工作,是以流水作业,提高企业生产自动化程度。

Effectively eliminates the surface of water droplets of materials, greatly reducing the labeling, packaging preparation, based on assembly line, to improve production automation.

18. 由于配备IMU/DGPS系统,在一定的基站范围内可以在无控制或少量控制点的情况下进行空三平差,极大地减轻了摄影测量外业控制工作量,缩短了生产周期,提高了作业效率。

With IMU/DGPS system, it can process bundle adjustment successfully with less GCPs or even without GCPs with a GPS base station located in a certain scope.

19. 在此基础上,本文尝试将缩短空闲时间法应用到多作业动态车间作业调度问题上。

The purpose of this paper is using the algorithm to solve the dynamic Job shop scheduling problems.

20. 在此基础上,本文尝试将缩短空闲时间法应用到多作业动态车间作业调度问题上。

The purpose of this paper is using the algorithm to solve the dynamic Job shop scheduling problems.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!