测试运行用英语怎么说,测试运行的英文翻译


词语导航

基本信息

词语:测试运行

繁体:測試運行

拼音:cè shì yùn háng

英语翻译

【计】 test run
【经】 trial run

分词翻译

测试的英语翻译:

test; testing
【计】 T
【化】 measurement and test
【经】 test

运行的英语翻译:

be in motion; function; move
【计】 run

翻译例句

1. 您还可以对这些对象执行测试运行。

You can also execute a test run of these objects.

2. 每行显示一个测试运行的结果。

Each row shows the results for a test run.

3. 时间:负载测试运行的总时间。

Time: Total time of the load test run.

4. 选择你想要包括在报告中的测试运行。

Select the test runs you want to include in the report.

5. 这时将出现该业务对象的测试运行窗口。

This brings up the Test Run Window with the business object.

6. 也许您有一个测试运行的时间非常地长。

Perhaps you have a test that takes an excessively long time to run.

7. 最明显的删节就是GUI测试运行程序。

The most obvious omission is a GUI test runner.

8. 测试运行在自己的进程中以消除边际效应。

Runs in its own process for side-effect free testing.

9. 您肯定希望在测试运行期间注意这样的情况。

This is definitely something you would want to watch for during a test run.

10. 测试运行后,操作的输出将显示为返回事件。

After the test runs, the output of the operation will display as a Return event.

11. 测试运行的时间长短取决于每个测试的长度。

The amount of time to run the test depends on the length of each test.

12. 这个部分反映了测试运行的概况。

This section gives you a good overview of how your test ran.

13. 对于每次测试运行,取消注释将被测试的方法。

Uncomment the method to be tested for each of the test runs.

14. 由于测试运行得太不频繁,它们常常充满了错误。

Because you run the tests so infrequently, they are often fraught with errors.

15. 在完成测试运行之后,就获取缓冲池快照,如下。

After the test run is done, obtain a buffer pool snapshot as follows.

16. 这个视图还包括表明整个测试运行总体结果的报告。

This view also includes verdicts, which indicate the overall result of the test run.

17. 其他说明:有关特定负载测试运行的任何其他说明。

Additional notes: Any additional notes regarding the specific load test run.

18. 如果测试运行的时间超过指定的毫秒数,则测试失败。

If the test takes longer than the specified number of milliseconds to run, the test fails.

19. 设置测试运行的顺序:顺序地、随机地或者加权顺序。

Set the order in which tests run: sequentially, randomly, or in a weighted order.

20. 压力工具在第一个迭代之后的每个测试运行中都会用到。wWw.WeNTIYi.COM

The stress tool was used during every test run after the first iteration.

21. 套件测试运行器:支持高效、快速地运行一组集成测试。

Suite test runner: support for efficient, rapid running of a suite of integration tests.

22. 一个包含FIT测试运行结果的输出.html文件。

An output.html file that contains the results of the FIT test run.

23. 这里您将看到实际上运用在测试运行中的URL编码查询值。

Here you will see the URL encoded query value that was actually used in the test run.

24. 如果测试运行需要太长时间,那么您可能就不想运行它们了。

When tests take too long to run, you probably won"t run them.

25. 推荐:我们建议对工作时间测试运行使用至少一台专用的机器。

Recommendation: We suggest using at least one dedicated machine for production-time test runs.

26. DOH还会报告测试运行、已发生的错误以及失败测试的总数。

The DOH also reports the total number of tests run, errors that occurred, and tests that failed.

27. 在每次测试运行之后便删除数据库person表中的所有记录。

All the records in the database PERSON table were deleted after each test run.

28. 因此,您必须在每次场景执行之后以及测试运行期间检查该文件。

Therefore, you must check this file after each scenario is executed as well as during the test run.

29. 这意味着你可以在测试运行的持续期间,验证程序系统的健康状况。

This means that you can verify the health of the application systems for the duration of your test run.

30. 这意味着你可以在测试运行的持续期间,验证程序系统的健康状况。

This means that you can verify the health of the application systems for the duration of your test run.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!