布线工程用英语怎么说,布线工程的英文翻译


词语导航

基本信息

词语:布线工程

繁体:佈線工程

拼音:bù xiàn gōng chéng

英语翻译

【化】 wiring installation

分词翻译

布线的英语翻译:

【计】 wire layout; wiring
【化】 wiring

工程的英语翻译:

engineering; project; work
【机】 engineering; process

翻译例句

1. 本文从当前综合布线工程施工监理工作的实际情况出发,对综合布线工程监理的主要思路进行了探讨。

In light of the current situation of GCS supervision, this article probes into the primary concepts of works of GCS supervision.

2. 根据国内许多行业计算机网络集成综合布线工程的方案设计与施工实践,提出较为优化的结构布线设计方案。

According to the domestic many computer network integration synthesis wiring plan design and construction practice, proposed optimizes structure wiring design proposal.

3. 她学过一些砌砖、布线和管道工程的基本技术。

She learned the rudiments of bricklaying, wiring, and plumbing.

4. 很多公共事业设备对更换电缆布线直接没兴趣:因为这将要求所有工程师重新接受训练。www.WenTiYI.cOm

Many utilities are simply not interested in changing their cabling: it would require all their engineers to retrain.

5. 早期的个人走场,以及布线的精炼将确保整个过程适合既适合高尔夫与对全面的总归图起作用,对于工程最终的全面成败十足关键。

Personally walking and refining the routing at this early stage will help ensure the journey works for both the golf and the overall masterplan, essential for the overall success of the project.

6. 她学习了砌砖、布线和管道工程的基本知识。

She learned the rudiments of brick-laying, wiring and plumbing.

7. 她学习了砌砖、布线和管道工程的基本知识。

She learned the rudiments of brick -laying, wiring and plumbing.

8. 通过一个具体的工程案例,阐述了可视对讲系统的设计方案、系统配置及系统布线和系统布管问题。

Through a specific project case, the design program, system configuration, system cabling and system tubing of the visual inter-conversation system were introduced.

9. 结合乔波冰雪世界滑雪馆工程实例说明结构化综合布线系统的设计思想及其应用。

This article combines with the project of Ski Hall of Qiaobo Ice-snow World to show the application of the structural comprehensive wiring system and the design philosophy.

10. 电气布线,是家居装修装饰中的一项基础工程,电装工程质量好坏,直接关系着住户用电安全以及方便。

Electrical wiring, is a basic project of home decoration decoration, electrical installation project quality is good or bad, directly related to the household electricity safety and convenience.

11. 以湘潭大学图书馆布线系统为例,介绍了综合布线系统的特点及其在工程中的应用情况。

Taking the project of Xiangtan University library for example, the feature of comprehensive distribution system and its application in project were introduced.

12. 中国布线市场已经分化为工程市场和分销市场,工程市场已经成为市场的主体。

China cabling market has separated into project market and distribution market while the project market had become the major part of the cabling market.

13. 因此,在新建大楼或旧楼改造的工程中迫切需要一种先进的布线系统来铺设信息高速公路。

Therefore, we need a kind of advanced wiring system urgently in setting up the engineering of the new mansion or old building rebuilding to lay the information superhighway.

14. 建筑与建筑群综合布线系统工程验收规范。

Code for engineering design of generic cabling System for building...

15. 对实际网络工程的分析与应用,以及综合布线要求具有一定的指导意义。

Theoretic analysis results can be used to guide the practical Generic Cabling engineering to meet the requirements of different kind of networks.

16. 根据工程项目的特征及要求,给出综合布线系统的工程设计方案、系统图、系统主要材料清单等。 然后对该综合布线系统的施工与验收进行了阐述。

According to this project"s characteristic and its request, it provides the engineering design plan, the system diagram, the information distribution map and the device list.

17. 综合布线系统是智能图书馆建筑的基础,为确保其质量,图书馆必须加强对工程质量的检测与验收。

Premises Distribution System is the foundation of the intelligent library buildings. For insuring its quantity, the library musts enhance the test and check for engineering quantity.

18. 根据智能办公大楼的工程实际情况,对其综合布线系统方案进行了研究。

According to the practical situation of the intelligent office block, its project research of PDS was carried out and the design of each subsystem was described in detail.

19. 数据信号传输采用一对一寻址的RS - 485总线传输,造成工程开工布线工程完工后的拆卸工作繁重,甚至可能引起仪器损坏。

Data acquisition signals are communicated with RS485 bus point to point. As a result, installation and disassembly of instruments become heavy loads, and instruments may be damaged easily.

20. 发射器工程平方英寸线,这意味着,信号和电源电压,使用同样的布线工作。

The transmitter works in2 wire, that means that signal and supply voltage are done with the same cabling.

21. 追溯适用这一标准的新服务或整容的车辆或部件,即综合布线系统或设计被界定之前,上述日期,应在谨慎的设计工程师。

Retrospective application of this Standard on new or facelift vehicles or components on which the PDS or design was defined prior to the above date shall be at the discretion of the design Engineer.

22. 消防、弱电、空调三支分包队伍亦基本完成了管道工程布线

Fire control, weak electricity, and air conditioning, these three sub-teams have basically completed the plumbing and wiring locating.

23. 消防、弱电、空调三支分包队伍亦基本完成了管道工程布线

Fire control, weak electricity, and air conditioning, these three sub-teams have basically completed the plumbing and wiring locating.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!