1. 估计的要完成的下一阶段成本。
Estimated next phase cost to complete.
2. 下一阶段成本形势稳定性。
Next phase cost outlook stability.
3. 针对于这些问题,阐述了施工阶段成本控制的方法。
Based on these problems, this paper expounds the construction stage of cost control method.
4. 针对于这些问题,本文提出了施工阶段成本控制的方法。
Targeted at these problems, the cost control method in the construction phase is proposed.
5. 设计阶段成本控制的实际效果表现出了良好的应用前景。
The actual effect of cost control in design phase represents a good future in application.
6. 新型边撑目前还存在一些不足,例如其结构参数还有待于优化;在试制阶段成本相对较高。
There are some deficiencies in the temple, like structural parameter of it needed being optimized, and the cost is relatively high in the trial-manufacturing moment.
7. 摘要设计阶段是项目成本控制的关键环节,但该阶段成本控制缺乏理论先进、操作性强的方法。
Abstract: Design stage is a key link of project cost control, but there is no appropriate method which is advanced in theory and easy in operability.
8. 本文通过介绍设计阶段成本控制的现状,引出限额设计,并对限额设计下如何开展成本控制进行了探讨和研究。
This paper introduces the current situation of cost control in design stage, then draws forth the quota design, and sums up and researches on how to control the cost in this process.
9. 这个项目还在草拟阶段,正在同以色列进行有关安全、后勤供应以及成本方面的讨论。
The project is still in the planning stages with discussions over security, logistics and cost under way with Israel.
10. 大部分的成本是在发射阶段省下来的。
Most of the cost saving comes at the launch stage.
11. 我们描述了为什么每个阶段是必需的以及降低成本的可能途径。
We have described why each stage is necessary and have also described ways of reducing costs when appropriate.
12. 为了优化软件开发项目不同阶段的资产,管理人员可以按项目和用户跟踪使用情况,从而获得成本数据。
To optimize assets at varying stages of the project of software development, the managers can get cost-accounting data by tracking usage by project and user.
13. 在项目的开发阶段发现问题显著地降低了修补缺陷的成本,增加了生产代码的质量,并且有助于团队按时交付应用程序。
Detecting problems in the development phase of a project significantly reduces the cost of fixing defects, increases the quality of produced code, and helps the team deliver the application on time.
14. 目前这两种检测方法尚处在研究阶段,在考虑进行临床运用之前,仍然有待于进一步降低DNA测序成本。
Both methods are in the research stage and require the cost of the DNA sequencing to drop even further before they could be considered for the clinic.
15. 同时,在经历了一个很长的单位工资成本上涨的阶段后,意大利和西班牙的竞争力似乎有所受损。
Italy and Spain, meanwhile, look hamstrung by a loss of competitiveness following a long period in which unit wage costs have risen.
16. 已经被普遍认识到的是:1在编码阶段检查并修正一个缺陷的成本比需求开发阶段这样做的成本要高五到十倍还不止。
It is widely recognized 1 that the cost of detecting and correcting a defect in the coding phase can be five to ten times higher than the cost of doing so during the requirements development phase.
17. 当我们谈到成本,最大的问题是初始阶段。
When it comes to cost, the biggest issue is getting started.
18. 分阶段方案意味着效益成本比也并不乐观,除非主管团队能积极推广并获得成功,否则项目也存在着关张的风险。
This phased approach means that the cost-to-benefit ratio isn"t rosy either, and unless the head team can deploy aggressively and successfully, the project is at risk of being shut down.wWw.WEntiYi.COM
19. 在该阶段,由于在广告和市场开拓上投入巨大, 造成该产品的成本迅速上升, 但任何新产品都要经历这一艰苦的过程.
The product’s costs rise sharply as the heavy expense of advertising and marketing any new product begins to take its toll.
20. 下一阶段的成本预测准确度。
Next phase cost prediction accuracy.
21. 实际的下一阶段的全部成本。
Actual next phase completion cost.
22. 大部分的成本是在发射阶段省下来的。
Most of the cost saving comes at the launch stage. Unlike conventional satellites, they don? T.
23. 如果这个缺陷直到维护阶段才发现,那么修正它所花的成本比需求阶段修正的成本高200多倍。
If the defect is not detected until the maintenance phase, it can cost up to 200 times more to correct it than it would have during the requirements phase. 2.
24. 这一阶段帮助降低集成成本,并可以更快地部署新的流程和服务。
This stage helps reduce integration costs and enables faster deployment of new processes and services.
25. 在阶段1期间,要确保一个方案是有成本效益的和满足客户需求的,我们就必须找出如何能够满足客户需求。
During Phase 1, we"d have to figure out how to satisfy requirements while ensuring a solution that was cost-effective and satisfactory to the customer.
26. 构建阶段在某种意义上说是一个制造过程,在此阶段要强调对资源的管理和对操作的控制,用来优化成本、进度和质量。
The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.
27. 构建阶段在某种意义上说是一个制造过程,在此阶段要强调对资源的管理和对操作的控制,用来优化成本、进度和质量。
The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.