
词语导航
基本信息
词语:跨距
繁体:跨距
拼音:kuà jù
英语翻译
span【化】 spacing; span; step
【医】 span
相关词条
1.strideddistance 2.unsupportedlength分词翻译
跨的英语翻译:
bestrad; cut across; step; straddle; stride【机】 amphi-
距的英语翻译:
be apart from; distance【医】 calcar; calcaria
翻译例句
1. 工作台导轨跨距大,抗颠覆能力强。WwW.WENTiYi.CoM
The guide rail of working table has large span and strong anti-overturn capacity.
2. 避免使用跨距标记、代码字体标记和font类。
Tags to avoid. Do not use span tags, code font tags, font classes, or CDATA tags.
3. 电动葫芦的起升高度及跨距以招标图为准。
Drawings in the bidding document can be taken reference for hoisting height and span of electric hoist.
4. 根据客户需求,我公司可以做出更特殊的跨距。
We can cu STomize the line distance ON more particular demands of our users.
5. 提出一种用于超长跨距无中继光传输系统的结构。
A novel structure for ultra long span optical transmission systems is proposed.
6. 设计顶部弦杆时,应在跨距中间有一临时螺栓铰接。
The top chords will be designed with a temporary bolted splice at mid-span.
7. 在任何超过一般跨距间隔的跨距中不得使用管件或接头。
Fittings or splices shall not be permitted in any span that exceeds the normal span interval.
8. 当较近支撑不可行时,则只能以最大跨距间隔进行支撑。
Supports shall be spaced at the maximum spans only when closer support is not possible.
9. 槽式钢制电缆桥架在不同跨距下最大允许均布载荷曲线图。
The maximum permitted average layout load curve chart for the steel slot-type cable bridge at the different span.
10. 梯级式钢制电缆桥架在不同跨距下最大允许均布载荷曲线图。
The maximum permitted average layout load curve chart for the steel step-type cable bridge at the different span.
11. 玻璃钢槽式电缆桥架在不同跨距下最大允许均布载荷曲线图。
The maximum permitted average layout load curve chart for the glass steel slot-type cable bridge at the different span.
12. 进行了主轴合理跨距的计算以及跨距对主轴动态性能的影响。
The calculate of proper span and its influence to dynamic performance.
13. 同一种滚筒直径又有几种不同的轴径和中心跨距供设计者选用。
One drum diameter has varied diameters of shaft and central spans so that the designers may have choice.
14. 并研究了三种失稳与砌体梁的跨距、高度及其承受载荷的关系。
Their relationships between instability of stacked layer and its span, height, and loading are studied respectively.
15. 并改善了棉纤维2.5%跨距长度、比强度和整齐度等品质性状。
Some fiber qualitative characters such as 2.5% span length, tenacity and length uniformity were improved.
16. 悬臂桥在利用中间桥墩的长跨距桥中它通常是不可行的桥梁结构。
Cantilever bridge piers in the use of long-span Bridges the middle it is usually not feasible in the bridge structure.
17. 我感觉您,那是怎么我知道您横跨距离和空间继续,在我们之间。
I feel you, that is how I know you go on, far across the distance and Spaces between us.
18. 与在河道下深打桥墩基础的短跨距相比,长跨距对航运更好更经济。
Wider spans are more economical and better for the navigation of shipping than shorter ones between piers with deep foundations penetrating the bed of the waterway.
19. 本栈桥具有单元互换性能和可变跨距等特点,经工程使用,性能良好。
This trestle bridge is characterized by unit interchangeability and bay adjustability. The application in construction site has proved its good performance.
20. 并以跨距为200米的索道桥为实例进行几种载荷作用下的静力分析计算。
As a practical example, calculation and analysis for the span 200 meters" cable-bridge in several load cases are done.
21. 阐述了基于UG铣加工过程3d跨距的原理,探讨其在曲面铣削中的应用。
This paper introduces the principle in 3d Stepover of milling manufacturing process based on UG and discusses its application in surface milling.
22. 在大跨距条件下用悬链法计算了光缆的相对伸长量与增强层厚度的关系曲线。
The cross section areas of overhead optical cable reinforcing materical are calculated for a big span.
23. 结果表明,合理的起跨距离和规范的摆动腿动作是提高跨栏成绩的主要因素。
It was showed that the reasonable distance of the striding hurdles and normal movement of the swing leg is the main factor of affecting the striding hurdles result.
24. 薄差油层具有储层物性差,数量多,在纵向上分散、跨距大,压裂改造困难。
Due to the poor physical property and large magnitude of thin pay zones, it is very difficult to apply fracturing remold.
25. 本文介绍了应用计算机寻求机床主轴部件最佳跨距,进行刚度计算的原理和方法。
This paper introduces fundamentals and a method to search the optimum spans for machine tool spindle in rigidity calculating by means of computer.
26. 在重力作用下的接触网是悬链形,弓网接触力在一个跨距内呈现规律的起伏变化。
The catenary"s shape influenced by gravity is curve, and the pantograph-catenary contact force changes regularly with pattern during one span.
27. 当望远镜跟踪天空中的一个目标时,目前的数据记录器有能力对频率进行“跨距”记录。
The current data recorder has the ability to "step" in frequency when the telescope is tracking a spot on the sky.
28. “跃龙”品牌系列电缆桥架的最大载荷、支撑间距应小于允许载荷和支撑荷和支撑跨距。
The calculation of ledger maximum bending moment and deformation the even load of scaffold board and live loads above the ledger.
29. “跃龙”品牌系列电缆桥架的最大载荷、支撑间距应小于允许载荷和支撑荷和支撑跨距。
The calculation of ledger maximum bending moment and deformation the even load of scaffold board and live loads above the ledger.
版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!
