词语:甩负荷
繁体:甩負荷
拼音:shuǎi fù hé
英语翻译
【化】 load rejection
相关词条
1.loadthrow-off 2.lossofload 3.loadshedding分词翻译
甩的英语翻译:
swing; throw; throw off; toss负荷的英语翻译:
bear; borne; load; onus【计】 load line
【化】 load
【医】 load
翻译例句
1. 从而进行了甩负荷、变负荷和变速试验。
Thereby load rejection tests, variable load tests and variable rotating speed tests are performed.
2. 但是现有的汽轮机模型用于甩负荷工况还存在一些问题。
The existed steam turbine model will face some problems when applied to load rejection condition.
3. 汽轮机甩负荷动态计算对机组的安全运行起着很重要的作用。
Dynamic calculation of steam turbine in load rejection condition is important to the safety of unit.
4. 提出了机组甩负荷试验和RB试验中锅炉侧的具体操作过程、要点等。
This article also suggested that detailed operation process of load rejection test and RB test.
5. 如何降低甩负荷时汽轮机组的动态超速始终是汽轮机控制系统设计的重要任务之一。
How to decrease the overspeed while the steam turbine suddenly lose full load is one of the important problems to design the control system of the steam turbine.
6. 介绍了河津电厂汽轮发电机组甩负荷试验,成功地实现汽轮机甩负荷小岛运行方式;
This test introduces turbine unit of HEJIN Power Plant load rejection experiment, and successfully realizes unit load-rejection-island operation method;
7. 此外,为了避免在甩负荷时转速形成明显的第二峰,电超速保护装置的推持时间宜取较小值。
Finally, for avoidance too large the second peak of the overspeed, to reduce the time constant of OP…
8. 在综合分析电力系统电压崩溃事故的基础上,提出了一种新的避免系统电压失稳的甩负荷方案。
The paper proposes a new method to determine a viable load shedding scheme to avoid voltage collapse.
9. 静态预测法是机组在静止状态下,利用测取油动机的动作过程时间,预测甩负荷最高飞升转速。
The static prediction method is to measure the processing time of actuators" movement when the turbine unit is under stationary state, and then predict the load rejection highest rising speed.
10. 对甩负荷试验的目的、时间安排、调节系统与OPC转速控制系统之间的协调关系等作了探讨。
Also the purpose, the arrangement schedule of load-rejection test as well as the coordinate relation ship between governing system and speed control system OPC are discussed.
11. 发电机带长线路甩负荷时,因容性电流对发电机产生助磁作用从而使发电机发生自励磁和过电压。
Self-excitation and over-voltage caused by generator load rejection with long lines occurs because of the capacitive current has a function to help the magnetic excitation of the generator.
12. 总体来说,尾水管进口断面水压在甩负荷过程中是升高的,而导叶后断面的水压随导叶关闭急剧下降。
The water pressure at the entrance of draft tube rises in the process of load rejection, but the pressure behind the guide vanes drops rapidly following the closing of operation.
13. 甩负荷预测功能是确保机组成功进行甩负荷的一项重要措施,大型汽轮机组中发生该功能失效的情况很少见。
Load dump anticipation (LDA) function are one of the important steps to ensure the success of the steam turbine load dump test, and this circumstance is vary rare.
14. 进行了现场甩负荷试验,实测了蜗壳压力、机组转速升高、导叶开度的变化过程,分析了爆破膜的工作特性。
Field tests were carried out and the pressure rise, speed rise and the turbine gate opening were measured during load rejections. The Characteristics of safety membranes is analysed.
15. 本文通过分析近期的现场测试数据,给出了混流式水轮机转轮叶片在启动、甩负荷、停机三种过渡工况下的应力状态。
This paper describe the blade stress state of Francis turbine in the course of starting, load rejection, stalling by analysing the field test data.
16. 大型超临界机组自身的安全性,直接影响到各大电网的安全性和稳定性,甩负荷试验是确保机组安全的一个重要手段。
The safety and stability of the major power grid are directly effected by the security of large supercritical unit. Load rejection is an important method to ensure the unit safe.
17. 这为解决非直联水轮发电机组甩负荷时转速上升的计算和调节负荷时调节系统稳定性的分析等问题提供了一个重要依据。
Thus an important basic is provided for calculation of speed rise when load rejection and for analysis of regulation system stability when load regulation.
18. 介绍了甩汽负荷试验的测试方法及计算方法,深入地分析与讨论了试验过程中几个关键问题,并提出自己的见解。
Test and calculation method of load rejection via dynamometry are introduced, several key factors involving the test are analyzed and discussed in detail, some Suggestions are presented in the end.
19. 介绍了三种在线校验方法:备用励磁调节、无功负荷转移和甩无功负荷。这些工业试验方法曾在葛洲坝电厂成功使用。Www.WentIYi.COm
The methods of using reserve excitation device, transferring reactive load and dropping reactive load are put into service for detecting polarity in Gezhouba Hydropower Plant.
20. 介绍了三种在线校验方法:备用励磁调节、无功负荷转移和甩无功负荷。这些工业试验方法曾在葛洲坝电厂成功使用。
The methods of using reserve excitation device, transferring reactive load and dropping reactive load are put into service for detecting polarity in Gezhouba Hydropower Plant.