底压用英语怎么说,底压的英文翻译


词语导航

基本信息

词语:底压

繁体:底壓

拼音:dǐ yā

英语翻译

【化】 base pressure

分词翻译

底的英语翻译:

a copy kept as a record; base; bottom; end; fundus; the truth of a matter
【医】 base; basement; bases; basi-; basio-; basis; batho-; bathy-; fimdi
floor; fundus; pavimentum; solum

压的英语翻译:

intimidate; keep under control; press; push down; shelve; suppress
【医】 prelum; pressurewWw.wEnTiYi.cOM

翻译例句

1. 桩浆桩的承载力较之普通灌注桩有显著提高;

The bearing capacity of base-grouted pile can be significantly improved in comparison with that of bored pile;

2. 提出了一种可用于固体燃料排条件下的解析计算方法。

It also suggests an analytical computational method for projectile base pressure under the condition of base bleed by solid fuel.

3. 管弄出来的载管路接头延伸至左右舷的双层载水井中。

Ballast line connection from the pipe tunnel to be extended to ballast well in the DB tank on port as well as Stbd side.

4. 介绍帕克西桥钻孔桩基础桩底压浆的施工,包括材料、设备及施工工艺。

This paper presents the construction process of pile base grouting for bored pile foundations of Paksey Bridge, in which the selected materials, equipment and construction technology are covered.

5. 本文介绍了天平尾支杆以及模型船尾对超声这弹丸测量影响的实验研究和理论计算。

This paper presents the effect of tail sting and the Angle of boat tail on the base pressure at supersonic velocities.

6. 泥浆护壁钻孔灌注桩当桩端持力层为砂土层等非岩石层时,通过桩密灌浆能有效地提高单桩承载力。

When the bearing stratum at the tip of bored pile is sandy soil stratum, the method of pile tip pressure grouting can effectively improve the bearing capacity of single piles.

7. 袋的西红柿给烂了。

The tomatoes at the bottom of the bag had been squashed.

8. 您可以在腹增大之前和正在增加的时候收缩盆肌,比如喷嚏、咳嗽、大笑或举重等情况下。

You might also contract your pelvic floor muscles just before and during any activity that puts pressure on your abdomen, such as sneezing, coughing, laughing or heavy lifting.

9. 大多半厚(粘稠)的机油在启动时实际上通过旁支泄阀又流回到油壳而不能进入策动机油道。

Most of the thick oil at startup actually goes through the bypass valve back to the engine oil sump and not into your engine oil ways.

10. 工具钢的一些应用有钻头、深模、刃、冲床、挤出模及切割刀具等。

Some applications of tool steels include drills, deep drawing dies, shear blades, punches, extrusion dies, and cutting tools.

11. 将面团入已喷油的9个3英寸的弹簧脱烤模。

Firmly press mixture into bottom of a 9 x 3-inch springform pan coated with cooking spray.

12. 结果表明,U型弧节流孔具有更大的降和更高的热力学效率。

It is shown that the U-bottom orifice has higher total pressure drop and (thermodynamic) efficiency.

13. 对密灌浆法用于桩灌浆提高钻孔灌注桩承载力的工艺和机理进行了探讨。

Technology and mechanism of compaction grouting used in bored pile base grouting to enhance the bearing capacity are discussed.

14. 采用炉炭胶入技术是提高炉冷却效果的一种可行的措施,具有一定的推广价值。

The cement pressing-in technology, a feasible measure to raise the cooling effect in furnace bottom, is worth promoting.

15. 本论文主要是针对远程下保护层开采条件下,对抽巷上向穿层钻孔抽放远程卸瓦斯技术进行了深入的研究。

This paper mainly researches on the technique of draining long distance pressure relief gas in bed plate tunnel under the circumstance of mining protective coal seam.

16. 顶塞具有一个实心的塞体,根据泵的增加它能可靠地显示与止塞箍和塞的接触。

The top plug has a solid body that provides positive indication of contact with the landing collar and bottom plug through an increase in pump pressure.

17. 目的探讨第三趾总神经卡综合征的发病机理、诊断和治疗。

ObjectiveTo study the pathogenesis, diagnosis and treatment of the compression syndrome of the third common plantar digital nerves.

18. 有美观的花朵图案,并带大量凸饰,风格极为都市化的鞋大,这些是该司的最新款式。

Embossed with floral motifs, with heavy duty welting of more urban city-style finish, these are the latest creations from this firm.

19. 探讨了漏磁检测在常储罐罐腐蚀缺陷检测中的应用。

Application of magnetic flux leakage (MFL) testing to the detection of corrosion in atmospheric storage tank floor was studied.

20. “曲”理论认为眶壁更脆弱是由于眶下管所致,它导致原本就薄弱的眶下壁更加的脆弱。

Proponents of the "buckling" theory propose that the orbital floor is particularly vulnerable as the infraorbital canal further weakens the floor"s already delicate bony structure.

21. 其内部由于中心负而形成空气柱,当流场稳定后,该空气柱从流口到溢流口贯穿始终。

Air core comes into being because of central minus pressure and goes through the hydrocyclone from the overflow gate to the bottom outlet after the flow field become steady.

22. 结合杭州利群大厦工程实例,介绍了桩浆技术的特点、施工工艺和质量控制。

Combining with the Hangzhou Liqun Building project, authors introduce some aspects of the pile-bottom post-grouting technology such as features, construction methods and quality control.

23. 风洞顶壁上最佳测点非定常力迟滞环方向与风洞壁上对应最佳测点非定常力迟滞方向相反。

The hysteresis direction at the optimum measuring pressure point on top wall is opposite to that on bottom wall.

24. 本文探讨了漏磁方法在常储罐罐腐蚀缺陷检测中的应用问题。

This paper discusses the problem of the Magnetic flux leakage as to applied to atmospheric storage tank flat bottom tank floor corrosion inspection.

25. 本机适合于冷粘鞋合大后的冷却定型工序。

The machine is suitable for dealing with the setting of cool shoes after pressing the outer sole.

26. 在加载条件下,欠实带的顶、壳发生剪切破裂,壳早于顶壳。

In loading condition, the shear fracturing of the bottom shell of the uncompacted belt would appear earlier than that of the top.

27. 在加载条件下,欠实带的顶、壳发生剪切破裂,壳早于顶壳。

In loading condition, the shear fracturing of the bottom shell of the uncompacted belt would appear earlier than that of the top.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!