
词语导航
基本信息
词语:坑口
繁体:坑口
拼音:kēng kǒu
英语翻译
pithead
相关词条
1.fallway分词翻译
口的英语翻译:
cut; gob; jaws; mouth; opening; ostium; scoop; stoma【医】 aditus; apertura; aperturae; aperture; bouche; introitus; meatus; mouth
opening; ora; orifice; orificium; oro-; os1; ostia; ostium; portal
stoma; stomata; stomato-; trema
翻译例句
1. 砾石坑大极了,坑口四周长着青草和野花。
The gravel-pit was very large, with grass and wild flowers round the sides at the top.
2. 打过下班铃后,井下的工人们就从坑口上来了。
After the knock-off bell, workers came up from the mining pits.
3. 前往宝琳或坑口o的乘客,请等待另一班列车。
Since passengers destined for Hang Hau or Po Lam, please wait for another train.
4. 请注意,前往坑口及宝林的乘客,请系本站转车。
Your attention please, passenger to hang Hau and Po Lam, please change train at this station.
5. 借鉴美国的经验对我国煤矿坑口电站建设提出了建议。
Proposals on the construction of pithead power plants in China are made in light of the experience of the U. S.
6. 某坑口电站因山坡蠕滑变形,导致电厂建筑物变形开裂破坏。
Owing to hillside creep at sliding, a power station near the pit of coal mine has deformed and cracking destruction has been caused.
7. 在距离坑口1.7米的搁板下面可能还“隐藏”着意想不到的惊喜。
Hang Hau from 1.7 meters below the Shelf may "hide" the unexpected surprises.
8. 本班列车以康城为终点站,前往坑口或宝林的乘客,请等候下一班列车。
This train will arrive at lohas Park, passengers to Hang Hau or Po Lam, please wait for the next train.
9. 本班系前往康城的穿梭列车,前往坑口或宝林的乘客,请等候下一班列车。
This train is the Shuttle train to Lohas Park, passengers to Hang Hau or Po Lam, please wait for the next train.
10. 列车由康城前往北角下一站:将军澳,乘客可以转乘列车前往宝琳或坑口。
Next station: Tseung Kwan O. This train stops service at Tiu Keng Leng. Passengers for Po Lam, Hang Hau, Yau Tong, Quarry Bay or North Point, please interchange at Tseung Kwan O Station.
11. 随着我国坑口电站的建设速度加快,大功率空冷机组正成为目前市场的主流产品。
With the fast development of the construction in pithead power plant, the large air cooling steam turbine has been widely used in China.
12. 陕北及宁夏煤炭资源极其丰富,地理条件优越,交通十分方便,适宜建设坑口电厂。
North Shaanxi and Ningxia are extremely abundant in coal resources, with excellent geographical positions and transport facilities, suitable to build large size pithead power plants.
13. 在陨石坑口壁上也发现了并行线一样的裂缝,这可能是由于含冰物质热收缩现象造成的。
Parallel linear cracks are also observed along the crater wall over the gullies, which could be due to thermal contraction of ice-rich material.
14. 坍塌后的12天,在发现这些人还活着的时候,矿工的亲属们坑口附近建立了希望营地。
Relatives set up Camp Hope at the pithead when the men were found to be alive, 12 days after the collapse.
15. 有人搬石头放在坑口,王用自己的玺和大臣的印,封闭那坑,使惩办但以理的事毫无更改。WWW.WeNTIyI.cOm
And a stone was brought, and laid upon the mouth of the den; and the king sealed it with his own signet, and with the signet of his lords; that the purpose might not be changed concerning Daniel.
16. 坑口电站可以直接将一次能源转化为二次能源,减少输煤损失和环境污染,具有很大的优势。
Mine mouth power plant can directly convert primary energy source into secondary energy, reducing coal loss in the transportation and environmental pollution, so it has tremendous advantages.
17. 论述水煤浆气化制合成气或甲烷时,用坑口气化取代单项化工装置前气化,具有明显的优越性。
This article describes the obvious advantages of synthetic gas or methane production by water coal slurry gasification through pit mouth gasification rather than single unit chemical plant.
18. 我国北方地区主要建火力发电厂,建坑口电站更为经济节约,但建坑口电厂必须要解决水源问题。
In north China, thermoelectric power station is often selected to build. And the pithead power plant is more economical, but the water source must be solved firstly.
19. 装备停当以后,工程师教他的伙伴们退到相当远的地方去,他在坑里灌满了硝化甘油,一直灌到跟坑口齐。
This apparatus being then arranged, the engineer, after having sent his companions to a distance, filled the hole, so that the nitro-glycerine was on a level with the opening;
20. 同时,阿拉善盟计划以“风、光、火”打捆的方式,规划建设那林苏海特、额尔登布拉格煤矿坑口电厂及电力外送通道。
Meanwhile, Alxa League planned to build the power plant and electric transportation channel in the pithead of Nalinsuhaite and eerdengbulage coal mine by the way of bundling the wind, light and fire.
21. 通过对硬岩型铀矿坑口堆浸法的工艺流程分析,总结出坑口堆浸成本由矿石开采费用、主要原材料费用等14项要素组成,并建立了地质经济评价模型。
By analyzing the technical flow of pithead heap-leaching uranium deposits of hard-rock type, the authors analyze its 14 cost items such as ore mining fee and major materials fee etc.
22. 通过对硬岩型铀矿坑口堆浸法的工艺流程分析,总结出坑口堆浸成本由矿石开采费用、主要原材料费用等14项要素组成,并建立了地质经济评价模型。
By analyzing the technical flow of pithead heap-leaching uranium deposits of hard-rock type, the authors analyze its 14 cost items such as ore mining fee and major materials fee etc.
版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!
