尖桩用英语怎么说,尖桩的英文翻译


词语导航

基本信息

词语:尖桩

繁体:尖樁

拼音:jiān zhuāng

英语翻译

picket

相关词条

1.pointedstake  

分词翻译

尖的英语翻译:

needle; piercing; point; sharp; the best of its kind; tip; top
【医】 apex; apices; apico-; cusp; cuspis; mucro; point; puncta; punctum; tip

桩的英语翻译:

picket; stake
【医】 dowel; pivot; post

翻译例句

1. 我们走过尖桩篱栅门,四处观望。

We walked through the gate of the picket fence and proceeded to look around.

2. 一道尖桩栅栏圈住了院子。

A picket fence surrounds the yard.WwW.WEnTiyi.COM

3. 它是雪白的尖桩篱笆,是工作,是厢式旅行车;

It"s the white picket fence, the job and the minivan.

4. 篱笆是白色尖桩篱栅,完全是装饰,拦不住任何人。

It"s a white picket fence, ornamental more than anything else. It couldn"t keep anyone out.

5. 铁路固定装置。信号装置。钢索传动。钢筋混凝土尖桩。

Fixed railway installations. signalling. wire transmissions. reinforced concrete pickets.

6. 为此,夫妇二人将已有的白色尖桩篱栅拆除,换上了被树木和其他植物包围的木板。

To do this, the couple replaced an existing white picket fence with a wood plank wall overhung with trees and plantings.

7. 以前我们对美国梦的理解一直都是:一所有尖桩围栏的漂亮房子。在过去的几年里这个定义又是如何变化的?

We"ve always had this idea of the American Dream: a nice house, picket fence. How has the definition changed over the last few years?

8. 那些想筹备婚礼或想买带有白色尖桩篱笆的房子的人们,请等到在繁忙的市中心度过这个兴奋的周末之后吧。

Planning the wedding or buying the house with the white picket fence CAN wait until after you slip off for a vibrant weekend getaway in a bustling metropolis.

9. 一个女性告诉艾丁说,她梦想有白色尖桩围栏,但她遇到的男人都无法满足这个愿望,所以她只能成为一个单亲妈妈,同时肩负着母亲、父亲、培育者还有供养着的角色。

“I want that white-picket-fence dream, ” one woman told Edin, and the men she knew just didn’t measure up, so she had become her own one-woman mother/father/nurturer/provider.

10. 他爬了上来,接着从一些尖硬的幼树上,砍下一些小桩,又把它们削得尖尖的。

He climbed out and from hard saplings cut stakes and sharpened them to a fine point.

11. 为此在施工中采用活瓣桩尖,并用0。

Therefore valve stopper is used in construction, and 0.

12. 动力打桩过程中,由于土层的振源在桩尖处,且由浅到深,通过远场在被保护对象附近设置减振沟是一项有效的减振措施。

Moreover, the damping ditch near the object to be protected is more effective to reduce the magnitude of vibration on account of the epicentre being in the deep soil.

13. 在浅覆盖层花岗岩地区进行钢管桩施工,存在易偏位、桩尖易卷口和进度慢等技术难题。

When installing steel tubular piles in regions where granite is shallowly overburdened, the piles are easy to deviate and the pile tip is easy to warp, resulting in slow driving.

14. 地震波的输入采用桩尖处输入。

The seismic load is input at the tip of the pile.

15. 支承桩的桩身摩擦力和桩尖阻力的大小与入土深度及桩身、桩尖处土层的相对刚度密切相关。

The value of frictional force of soil to pile body and resistance to pile toe has a close relation with the penetration depth and relative rigidity of soil layer at pile body and pile toe.

16. 无桩尖管桩锤打过程易造成管桩移位、内伤、断桩、嵌岩差、持力层锚固长度小。

Shift, internal injury, breaking, bad imbedded in rock, as well as short anchorage distance etc.

17. 某些工程中个别桩的桩尖进入持力层过浅,也是导致承载力无法满足设计要求的主要原因。

Another main cause of lower bearing capacity which can not meet design requirement is that several pile"s end enter too shallowly into supporting layer.

18. 在压桩过程中同时在桩侧注入浆液,桩尖达到设计深度后,浆液随着桩的沉入在桩端形成注浆扩大头。

In the time of pressing the pile, the grout are inject into the soil. When the pile tip reaches the design depth, then continue to inject grout into the pile, so that the pile head expand.

19. 用荷载传递方法,本文提出了用“桩尖位移等值法”,来计算桩的荷载-沉降曲线,并将用该法计算的P -S曲线与现场实测的数据进行对比,结果是吻合的。

In this paper, the writer proposed a method of equal pile point settlement for calculating P-S curve of pile. The result of calculation are fairly checked with those measured in the field.

20. 用荷载传递方法,本文提出了用“桩尖位移等值法”,来计算桩的荷载-沉降曲线,并将用该法计算的P -S曲线与现场实测的数据进行对比,结果是吻合的。

In this paper, the writer proposed a method of equal pile point settlement for calculating P-S curve of pile. The result of calculation are fairly checked with those measured in the field.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!