
词语导航
基本信息
词语:外节点
繁体:外節點
拼音:wài jié diǎn
英语翻译
【计】 exterior node
分词翻译
外的英语翻译:
besides; in addition; not closely related; other; outer; outside; unofficial
【医】 ec-; ecto-; exo-; extra-; xeno-
节点的英语翻译:
【计】 node; node point
【化】 nodal; nodal point; node
【医】 Gaussian points; nodal points
【经】 node
翻译例句
1. 本文建议一种利用元外节点的内插方案,从而得到完全相容的元素。
An interpolation scheme using out-element nodes so as to establish the entirely conforming elements is proposed in the present paper.
2. 讨论 外节点的抗剪机理及节点的受剪破坏形式,提出了节点 斜压破坏 的抗剪承载力计算方法。
The discriminant condition avoiding the baroclinic destruction and the method to calculate the shearing resistance are given from the mechanics of shearing resistance and the type of shear failure.
3. 系统总体功能覆盖了供应链的各个环节,从企业外节点供应商至企业内各物流环节:采购、仓储、生产等。
The overall function of the system has covered each tache of the supply chain, from suppliers outside the enterprise to every logistics tache inside the enterprise: purchase, storage and production.
4. SAX根据XML构造发回一个自由的事件流,除了当前正被处理的节点外不要求其它数据在内存中。
SAX sends back a free stream of events based on the XML constructs, and does not require data to be in memory except for the node currently being processed.
5. 此类概要是计算单元内和计算单元外的节点的迁移目的地,但是对于联合节点建议使用自定义概要。
This type of profile is the destination for the migrations of a node both in a cell and not in a cell, although the Custom profile is recommended for federated nodes.
6. 除了可用的连接外,还需要向套接字提供数据,以便由TCPIPClientInput节点驱动的消息流开始处理过程。
In addition to a connection being available, there must also be data presented to the socket in order for a flow driven by a TCPIPClient Input node to begin processing.
7. 故障转移是主系统在计划内或计划外的关闭,并包括完成将备用节点置于在线以接管处理负载的任务。
Failover is the planned or unplanned shutdown of the primary system and includes the accompanying task of bringing a standby node online to take over the processing load.
8. 除了光纤到户和光纤到节点这些方式外,电信运营商也使用其他一些方式打进电视市场。
As well as FTTP and FTTN, there are other ways for telecoms operators to get into the television market.
9. 其中除计及了节点注入功率不确定性、沿线事故发生地点的不确定性以及事故清除时间的不确定性外,还计及了负荷模型的不确定性。
In addition to considering the uncertainties of load forecasting at each node, the fault occurrence location and the fault-clearing time, the uncertainty of load model is also taken into account.
10. 我们以八个节点为起始,他们除了适合值不同外其他各个方面均相同。
We started with eight nodes equal in all respects except their fitness values.
11. 树是除根节点外其余的节点均为0的四叉树,它是零树的一种推广。
An X-tree is a spatial hierarchical tree whose all nodes are 0 except the root node. It is the generalization of the zero tree.
12. 通过试验以及非线性有限元研究发现:节点区翼缘板外伸宽度对节点抗剪性能的影响与梁柱抗弯刚度比有关。
The researches of nonlinear finite element and experiment indicate that the effect of anti-shear which is aroused by the width of the joints" wing board.
13. 本文根据试验和理论的分析结果,并参考相关设计规程,给出了外隔板式节点、垂直加劲肋式节点的设计建议。
The dissertation gives out the suggestion of outer diaphragm and flange stiffened joints based on the test, the academic analysis results and relative design codes.
14. 为了达到实用的目的,除标准规定外,在本文中还增加了系统用户界面,并增加了测试模块管理、测试节点部署的功能。
For practical purpose, the author gives test manager a user interface besides above responsibilities, and adds modules management function, testing node management function.
15. 在一棵完全二叉树的每一层,除最后一层外,其余各层都是填满的,并且最后一层的节点尽可能的靠左排列。
In a complete binary tree every level, except possibly the last, is completely filled, and all nodes in the last level are as far left as possible.
16. 在本算法中,除主机外的其它节点都采用了相同的驱动程序,因此实现了节点的即插即用。
In the proposed algorithm all nodes but the host adopt same driver, therefore the plug and play is realized for all nodes.
17. 在现代设计理论中除研究结构构件和体系的力学行为外,另一个重要的方面就是节点的力学性能。
Besides researching for the mechanics of structure system, it is important for us to pay attention to the study of the mechanical behavior of connections.
18. 计算了外荷载作用下各索单元轴力及节点位移的变化趋势。
Under the loads every calbe unit strength of axle and node displacement"s variation tendencies are computed.
19. 在风荷载或地震荷载等水平荷载及竖向荷载共同作用下,板柱节点除了要传递垂直剪力外,还必须传递较大的不平衡弯矩。
In addition to vertical shear force, slab-column connections also have to transfer unbalanced moment due to combined vertical and lateral forces as a result of wind effect or earthquake excitations.
20. 其基本思想是给除通信源节点外的其它参与节点分配适量的通信工作,减少发送源结点的工作量,以达到缩短系统响应时间的目的。
The basic thought is to assign proper work to the other nodes besides the communication source node, and so shorten the system responding time.
21. 对有端板加劲肋的外伸端板连接节点进行了循环荷载作用下试验研究,分析加劲肋对外伸端板连接节点性能的影响。
Research on extended end-plate connection with end-plate stiffer under cyclic load by test, discuss the effect of stiffer on the capability of the connection.
22. 除了很大的空间外,“宁静”节点还将为宇航员提供一个前所未有的角度来观测地球和接近的航天器,这是目前空间站所不具备的。
Besides a good deal more space, Tranquility will provide ISS astronauts with an unprecedented view of the Earth and of approaching vehicles that the station has lacked until now.
23. 节点区的宽梁箍筋对于凸出在墙外的宽梁上部纵筋的锚固具有比较重要的作用。
The beam stirrups are very important to the anchorage of the upper longitudinal bar in the beam outside the wall"s width.
24. 对于保守弯矩,节点外荷载弯矩的虚功产生外荷载刚度矩阵,这个矩阵会改变几何刚度矩阵一些项。
For conservative external nodal moments, the virtual work for the external moment can result in an external load stiffness matrix, which can significantly modify the geometrical stiffness matrix.
25. 在实际电力系统中,分析和调控的对象除了节点外,还包括许多潮流断面。
In a real power system, the objects of analyzing and adjusting are not only buses but also power flow interfaces.
26. 在船体结构强度直接计算方法中,需要建立三维有限元模型,船体所受到的外载荷也应相应地转化为有限元节点力。
It is necessary to set up a 3-d finite element model and to convert the external loads acting on the hull into nodal forces of finite element in the direct strength calculation of hull structure.
27. 对用套管加强的T型管节点在平面外弯矩作用下的极限强度作了参数化分析。
This paper presents the results of a parametric study to investigate the ultimate strength of sleeve reinforced hollow section T-joints subjected to out-plane bending.
28. 提出一种在节点区间断钢管混凝土柱的外钢管、设置芯钢管的新型钢管混凝土柱与钢筋混凝土梁的节点。wWW.WeNtIYi.coM
A new type of column-RC beam joint of concrete filled steel tube (CFST) is created. The outer tubular column of CFST is disconnected in the joint zone. The core steel tube is put in the joint zone.
29. 提出一种在节点区间断钢管混凝土柱的外钢管、设置芯钢管的新型钢管混凝土柱与钢筋混凝土梁的节点。
A new type of column-RC beam joint of concrete filled steel tube (CFST) is created. The outer tubular column of CFST is disconnected in the joint zone. The core steel tube is put in the joint zone.
版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!
