
词语导航
基本信息
词语:沉泥
繁体:沉泥
拼音:chén ní
英语翻译
【机】 silt
分词翻译
沉的英语翻译:
deep; heavy; sink
【医】 sink
泥的英语翻译:
mashed vegatable or fruit; mire; mud; slob
【化】 mud
【医】 pelo-
翻译例句
1. 其中雨水井,沉泥井,过街排水管部分多数由道路主体施工单位完成。
Water Wells of clay, and drain well across the road from main part most complete construction units.
2. 试验结果表明施用废弃的甜菜石灰、熟石灰和污水沉泥较大地提高了小麦产量。
The results showed that refuse sugarbeet lime, burned lime and sewage sludge significantly increased wheat yield.
3. 市政整体排水系统程序如下:路面雨水→雨水井→沉泥井→过街排水管→排水检查井→地下排水主干线。
The whole city drainage system program is as follows: rain water wells road, clay and drain well across the street and drainage inspection wells and underground drainage main lines.
4. 通过对杭州制水二公司平流式沉淀池污泥沉降曲线的测定、沉泥的量化,找到了一种较为直观、简单的以周期控制量为参照的排泥控制法。WWW.WENtIYi.cOM
We quantified the sedimentation by determination of sludge sedimentation curve and found out a simplified and perceived method to control the sludge discharge cycle.
5. 介绍了在遇到矸石泥化情况下的一种煤泥水沉清处理的办法,并介绍了加大沉淀面结以后所带来的经济效益。
Introduces a kind of method of water under meeting degradation in water circumstances, and after adding sediment area, it achieves the economic results.
6. 二级污水处理厂二沉池漂泥有反硝化漂泥、活性污泥老化漂泥、生物泡沫导致的漂泥。
There were anti-nitrification floating sludge, aged activated floating sludge and floating sludge from biological foam in the final settling basin of municipal second stage sewage treatment plant.
7. 灌注桩后压浆技术解决了桩底沉淤和桩身泥皮影响灌注桩承载力的问题,使桩底、桩侧土得到了加固,从而大幅度提高了灌注桩的承载力,降低了桩的沉降量。
Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting.
8. 灌注桩后压浆技术解决了桩底沉淤和桩身泥皮影响灌注桩承载力的问题,使桩底、桩侧土得到了加固,从而大幅度提高了灌注桩的承载力,降低了桩的沉降量。
Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting.
版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!
