按项目进行用英语怎么说,按项目进行的英文翻译


词语导航

基本信息

词语:按项目进行

繁体:按項目進行

拼音:àn xiàng mù jìn háng

英语翻译

【计】 item advance

分词翻译

按的英语翻译:

according to; control; leave aside; press; push; refer to
【电】 press

项目的英语翻译:

item
【化】 item; project
【经】 item

进行的英语翻译:

carry out; go on; proceed; be in progress; conduct; march; process; travel
【医】 progression
【经】 steer; undertake

翻译例句

1. 几乎整个软件行业都采取按项目进行管理的模式。

Almost all the software enterprises manage their business with the mode of project management.

2. 事实上,RUP最新版本(7.0)的第一个关键原则是“使过程适应组织和项目”,所以您需要将RUP按您的组织及其项目的大小和需求进行剪裁。

In fact, the first Key Principle of the latest version of RUP (7.0) is "Adapt the Process," so you need to tailor RUP to the size and needs of your organization and its projects.

3. 这项新技术将在未来的直升机头盔显示器项目中按客户要求进行实施。

The new technology will be implemented in future Helicopter HUD programs per customer requests.

4. 首先,清理数据和构建存储库几乎总是按每个项目逐一进行。

First, data cleansing and repository building are almost always carried out on a project by project basis.

5. 对于一个项目来说,管理人员创建工作计划、为“小组”召集开发人员并保持每个人都有任务、按调度进行并且开销在预算内。

For a software project, management creates work plans, recruits developers for the "team," and keeps everybody on task, on schedule, and on budget.

6. 集成项目计划则确保团队之间的相互依赖在可管理的范围内,项目能够按日程表的进度进行以及不超出预算。

The integrated project plan ensures that dependencies between groups are managed and the project remains on schedule and within budget.

7. 传统方式下,按项目来进行组织是为了聚焦于任务,需要不同资源组织的合作。

Traditionally projects were organised to put focus on tasks that needed the cooperation of several line organisations.

8. 用项目资金购置的配套设备按固定资产进行管理。

The supporting equipment purchased by project funds shall be managed as fixed assets.

9. 按常规收集有关为了完成项目工作而进行的项目活动工作状态的信息和数据,属于执行项目管理计划的一部分。

Information on the status of the project activities being performed to accomplish the project work is routinely collected as part of the project management plan execution.

10. 当乙方的人员被其甲方指派至任何内部项目,甲方应当以小时为基础按此等人员的报酬费率进行计费。

Where the personnel of UL-STR are assigned by its Customer to any in-house projects, the Customer shall be billed on an hourly basis on the compensation rates of its personnel.

11. 你或许要对项目范围进行更准确的定义,以便按阶段实现项目目标,而不是连爬都不会就想跑。

The scope of your project may need to be better defined, so that you reach your goal in stages, rather than trying to run before you can crawl.

12. 介绍了M 24型高压开关柜(引进法国阿尔斯通技术),按国家标准规定进行项目指标测试情况。

Introduction to the situation to carry out item index tests for Model M24 high voltage switchgear cabinet (technology from Alstom, France) according to the national standards was made.

13. “如果管理关怀能真正比按项目付费带来更好的服务”,戴安-罗兰德,委员会(指导国会在公共医疗补助政策上进行决策)主任说:“这是一群能证明管理关怀可行的人。”

"If managed care can really deliver better care than fee-for-service", says Diane Rowland, chair of the commission that advises Congress on Medicaid, "this is the population that could prove it.

14. 为了决定是否对项目基准按建议的修改进行更改,以下何项应安排到位? 。

To determined if proposed modifications to the project baseline should be made, what should be put in place?

15. 认真检查、试验已完相关工程。项目技术经理带领技术人员按规定的运行方式、功能要求对新增设备进行试验。

Carefully check and test the projects completed, the Technical project Manager lead technicians to test the new equipments under specific operation mode and functional requirement.

16. 按《通知》要求,沈阳市房产部门将在沈阳市房产网上对所有商品住房在售项目的预售审批、预售房源和预售价格情况进行公示。

According to the circular, Shenyang"s real estate authorities will report approval, Numbers and prices of all pending houses on its official website.

17. 在公司财务方面,根据公司资金情况,按市场变化进行新项目业务的分析、评估、决策,从而实施。

For the accounting dept, analysis, appraisal and making decision to carry on new project according to the company fud situation and market change, thus implements.

18. 这些软件包有助于理顺决策过程,按这个过程,采购定单、抵押申请、客户来信、项目报告、表格和其它数据源沿决策链进行传送。

They help streamline the processes by which purchase orders, mortgage applications, customer letters, project reports, forms and other data sources are passed along the decision-making chain.

19. 使用此方法可查找在工作项标题字段中含有公共词或词组的工作项,也可以选择按团队项目和工作项类型进行查找。

Use this method to find work items that have a common word or phrase in the work item title field, and optionally by team project and work item type.

20. 菜单中你可以按项目的名称进行升序或降序排列,或者你可以用手工的方式将一个区域的项目移到你想要的位置。

The context menu allows you to apply an ascending or descending sort based on the item names, or you can manually move items of a field to the position you want.

21. 按项目时间、文档内容、文档文件类型等对工程文档信息进行分层,以PBS为标识系统,形成工程文档编码的目录集成结构模型。

This model, with PBS as sign system, delaminated according to time, information content and document type is a kind of project document code catalog integrated structure.

22. 同时,针对项目经理管理按不同工程招标方式涉及不同环节和不同管理模式的情况,进行管理流程分析和数据流程分析。

Meanwhile, control flow analysis and data flow analysis are made based on different processes and monitoring models involved in different ways of bidding.

23. 上涨的建造花费造成了短期的压力。这使得这些中的许多项目没能按原计划进行。

Many of these projects were derailed by the short-term pressure of rising construction costs.WwW.wEnTiyI.cOM

24. 比赛检录:按竞赛项目分别于赛前40分钟在规定区域进行检录,特邀运动员在指定的检录区进行检录。

Roll-call: The event will be roll-called in divided regions 40 minutes ahead of the starting time. For elite athletes, roll-call will be done in specified call room.

25. 方法对2001年至2005年5年间在空军总医院体检的中老年干部,按总部规定的体检项目进行健康查体。

Methods The information of middle age and aged air force cadres who took medical examination according to standard of the army cadres routine medical examination from 2001 to 2005 was collected.

26. 这种方法按风险来源作为风险因素对项目区域风险进行分类,每大类再按其属性分层次评价,并依次将评价结果进行合成后得出最终的综合评价排序。

Then, every major class is analyzed hierarchically and after the integration of each subsequent evaluation the final ranking order is displayed on the basis of comprehensive evaluation.

27. 这种方法按风险来源作为风险因素对项目区域风险进行分类,每大类再按其属性分层次评价,并依次将评价结果进行合成后得出最终的综合评价排序。

Then, every major class is analyzed hierarchically and after the integration of each subsequent evaluation the final ranking order is displayed on the basis of comprehensive evaluation.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!