路径计划用英语怎么说,路径计划的英文翻译


词语导航

基本信息

词语:路径计划

繁体:路徑計劃

拼音:lù jìng jì huá

英语翻译

【计】 route planning

分词翻译

路径的英语翻译:

method; path; route; way
【计】 path
【化】 path
【医】 pathway

计划的英语翻译:

plan; design; blueprint; calculate; intend; project; propose; scheme; proposal
program
【计】 planning
【医】 project
【经】 output budgeting; plan; program; project; proposition; scheme

翻译例句

1. 覆盖的或者多余的路径是从计划测试用例执行库中清除的候选者。

Overlapping or redundant paths are candidates for removal from the planned test case execution library.

2. 他们需要培养计划,海外轮岗以及清晰的晋升路径

They need training programs, overseas rotations and clear paths for advancement.

3. 这些不同的方法就是众所周知的访问路径或访问计划

These different ways are known as access paths or access plans.

4. 该方法的运转类似汽车的卫星导航系统,在计划偏离轨道时,可以自动调整路径

This approach acts like the satellite-navigation system of a car, automatically replotting the route when the plan goes off course.

5. 在消息经过该目的地时,将为反向路由路径(如果已经存在一项)预先计划这个目的地。

This destination will be prepended to the reverse routing path (if one already exists) as the message travels through that destination.

6. DTN计划的主要目标是开发和部署一项能够具备可靠传输关键信息特性的网络,甚至是在网络中没有端-端路径的情况下。

The primary goal of the DTN program is to develop and field network services that deliver critical information reliably even when no end-to-end path exists through the network.

7. 法约尔和泰勒1900年左右对管理目的的描述,已经成为现代的经典:管理就是计划一条完成工作的最佳路径

In the now-classical characterization delineated around 1900 by Henri Fayol and Frederick Taylor, the purpose of management was to plan the one overall best way to approach work.

8. 对于最佳实践或者计划采用相关的最佳实践,路线图应该有单独的路径

The roadmap should have a separate path for each of the best practice or set of related best practices that you plan to adopt.

9. 访问计划描述访问路径,这些路径是DB 2优化器为sql语句访问数据而选择的。

Access plan describes the access path that the DB2 optimizer has chosen for accessing data for an SQL statement.

10. 虽然我已经降低瓶径的风险并在关键路径上提供了一些额外的时间,但是我在整个项目计划中没有增加时间。

Although I have reduced the risk of bottlenecks and provided some additional lead time to the critical path, I haven"t added any time to the overall project plan.

11. 在路径分解和查询计划选择的过程中,利用查询树中的目标节点来避免中间结果的传递。

In the procedure of path decomposition and query plan selection, target node in the query tree is utilized to avoid the transfer of the intermediate results.

12. 商业领导者通常使用关键路径分析来制定大型商业项目的计划

Business leaders use a system called Critical Path Analysis to plan large-scale business projects.

13. 在计划优化模块中,详细讨论了存取路径的选择和代价评估的计算方法。

In plan optimization module, the access path selection and the account method of cost evaluation are discussed in detail.

14. 临床路径是指对某些特定病种患者在住院期间按预定的医疗护理计划进行治疗护理。

Critical pathway is the medical treatment and care for certain kinds of diseases in patients during their hospitalization according to a predetermined plan.wWw.wENTiyI.cOM

15. 在分析热轧生产批量计划通用模型的基础上,采用了带有时间窗的车辆路径问题模型。

The VRPTW model that is suitable to resolve the problems of the production lot planning of the hot rolling strip is suggested.

16. 为了规范医疗保健过程、减少开支,卫生部计划到2011年末为300种疾病制定出临床路径

The Ministry of health will map out clinical pathways for 300 kinds of diseases by 2011 in a bid to standardize healthcare processes and reduce costs.

17. 该算法使用位置矩阵编码方式表示所有组合路径和重计划信息。

A position matrix coding scheme was used to express simultaneously all of composite paths and re-planning information in the algorithm.

18. 结果表明,所提出的模型既能正确、直观地表达工程计划问题,又能形式化描述、计算工程计划关键路径问题。

The conclusion is drawn that FTPN can not only be used to express the project planning properly and clearly, but also give a formal representation and computation easily.

19. “新教师计划”所推出的教师教育是美国替代传统教师培养和管理模式的一种新路径

The new teacher Project is a new pattern to train and manage new teachers in place of the traditional teacher training and management pattern.

20. 本文提出了更为接近热轧批量计划编制实际的特殊不对称车辆路径问题作为热轧批量计划编制问题的数学模型。

A special asymmetric vehicle routing problem is presented for modeling the hot rolling lot planning since it accords with the production practice.

21. 工票的排程:通过定义路径计划工作时间,资源的负载,能够很快的发现资源需求量以及瓶颈。

Schedule work Orders: Define routings and plan the working time and capacity of your resources.

22. 并对关键链项目管理方法与传统的项目管理方法,如关键路径法、计划评审技术的优势和劣势进行了比较。

Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.

23. 当一个项目中的大多数活动同以往执行过很多次的其他活动类似时,通常采用关键路径法(CPM)进行计划编制。

When most of the activities in a project are similar to other activities that have been performed a large number of times, CPM scheduling is generally used.

24. 欧洲研究计划框架(安全)—路网中路径选择的安全性:模拟路径选择。

Dijkstra, A. and Drolenga, H. (2008) Research in the framework of the European research programme In-Safety — Safety effects of route choice in a road network: Simulation of changing route.

25. 通过在底板中有计划安置的且相对比率的开口,提供改善的空气通路和流通路径,同时降低了收缩和沟道的影响。

Improved air ducts and flow paths are provided, while the effects of shrinkage and channeling are reduced, through a strategically placed and relative percentage of openings through the floor.

26. 通过在底板中有计划安置的且相对比率的开口,提供改善的空气通路和流通路径,同时降低了收缩和沟道的影响。

Improved air ducts and flow paths are provided, while the effects of shrinkage and channeling are reduced, through a strategically placed and relative percentage of openings through the floor.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!