甘特图用英语怎么说,甘特图的英文翻译


词语导航

基本信息

词语:甘特图

繁体:甘特圖

拼音:gān tè tú

英语翻译

【计】 Gantt chart

分词翻译

甘的英语翻译:

pleasant; sweet; willingly
【医】 gluco-; glyco-

特的英语翻译:

especially; special; spy; unusual; very
【化】 tex

图的英语翻译:wWw.wEnTiyI.COM

chart; drawing; fig.; map; plot; picture; intention; attempt; plan
【计】 diagram; graphtyper
【化】 diagram
【医】 chart; column diagram; diagram; graph; map; picture; schema; scheme
sheet

翻译例句

1. 我们没有绘制甘特图,因为我们并不需要它。

We didn"t have a Gantt chart, because we didn"t need one.

2. 进程(改变)导致不喜欢(会议或者)

Process leads to Hate (and meetings, and Gantt charts)

3. 单击此处可重命名所选甘特

Click to rename the selected gantt chart.

4. 2:基于架构设计中重要元素之间依赖性的甘特

Figure 2: Gantt chart based on dependencies between architecturally significant elements.

5. 第1部分中的甘特描述了我们第1阶段的工作任务包。

The Gantt chart in Part 1 outlined our Phase 1 work packages.

6. 甘特显示活动顺序多久,每个人都应该采用。

Gantt charts show the sequence of activities and how long each should take.

7. 甘特是工程项目进行工期计划和控制的有效工具。

Gantt chart is an effective tool for planning and controlling project schedule.

8. 使用甘特、PERT、策划树等工具策划项目。

Plan the project using tools such as Gantt chart, PERT chart, planning trees, etc.

9. 甘特形的优势是其简洁,便于准备和使用,且成本低。

The advantages of the Gantt chart are its simplicity, ease of preparation and use, and low cost.

10. 在进度控制方面,使用的主要工具是和核查清单。

In the schedule control, the main tools are Gantt chart and check list.

11. 当你以交付功能的方式度量成功时,绘制精美的甘特就是你的指路明灯。

When you measure success in features delivered, your guiding star is the carefully crafted Gantt chart.

12. 一种改进的,它具有能列出全部部门或者是定的资源的能力。

A modified Gantt chart that schedules capacity by entire department or specific resources.

13. 针对流水调度和作业调度给出了算法实例,并且绘制出了流水和作业调度的

Give the arithmetic examples of flow shop and job shop, and show their schedule Gantt pictures.

14. 介绍了网络计划技术的原理和网络的绘制,并与传统的特图分析方法进行了比较。

The principle of network planning technique and network chart drawing method are illustrated and compared with Gantt chart analysis method in this paper.

15. 您可以想象他们这么做实际上是在构建一幅越来越详细的(Gantt chart)。

You can imagine them building up the Gantt chart as they go, filling in more and more detail.

16. 作者对检修过程进行流程设计,提出利用、网络编制进度安排,利用偏差分析法对进度进行分析。

Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.

17. 有时柱状也被称为特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。

Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.

18. 另外,他们通常用来衡量整个项目的进程,在甘特图上会显示已经完成了33%尚未完成66%,诸如此类。

In addition, they typically measure progress using Gantt charts that indicate the project is 33 percent complete, 66 percent complete, and so forth.

19. 传统的项目管理工具,如PERT特图,都能清楚地显示各个作业之间的相互关系,也适用于合理安排作业执行的顺序。

The traditional project management tool, such as PERT and Gantt chart are used in activities sequencing. Those activities are independent with each other.

20. 如果要将指定条形绘在其他条形之上,请双击“特图”上打开的区域然后在列表中将前景条形移动到背景条形的下面。

To set a particular Gantt bar to be drawn over another bar, double-click an open area on the Gantt Chart and move the foreground bar below the background bar in the list.

21. SVG表组件通过读取多种数据源,如常见的数据库、XML文档,可以生成各种样式的表,如饼、柱状、曲线甘特图等。

SVG chart components can produce varietious different kinds of charts, such as pie, bar, curve, gantt etc, by reading varietious data sources like common database, XML.

22. SVG表组件通过读取多种数据源,如常见的数据库、XML文档,可以生成各种样式的表,如饼、柱状、曲线甘特图等。

SVG chart components can produce varietious different kinds of charts, such as pie, bar, curve, gantt etc, by reading varietious data sources like common database, XML.

版权声明:问题易所有作品(图文、音视频)均来源网络,版权归原创作者所有,与本站立场无关,如不慎侵犯了你的权益,请联系我们告知,我们将做删除处理!